20) Prepared detailed a report on “Water Theft, Tampering of Outlets and Crop Water Requirements”, Organized a workshop at TandoJam.
21) Published proceedings of Farmers Workshop on “Water Theft Tampering of Outlets and Crop Water Requirements on April, 2004 at Tandojam.
22) Published informative brochure on environmental issues such as “Water”, “Soil”, “Biodiversity” and Introduction of EMMP-LBOD & EMU-Sindh” during EMMP-LBOD Workshop.
23) Prepared Detailed Report on Environmental Degradation of Hamal Lake & Adjoining Areas due to the Effluent of Balochistan & Upper Sindh Areas, in May-2005. The report has been submitted to Honorable Minister for Irrigation & Power, Government of Sindh, Secretary IPD and other concerned officials.
24) Attended On-Job Training Program on EMP for Officers of Environmental Management Units of all over Pakistan at NDP Lahore;
25) Attended the workshop on ‘Water Control and Discharge Measurement” organized by MUTE and PTC-SIDA.
26) Attended the workshop on “Environmental Issues related with Water Sector in Pakistan at Lahore organized by Punjab University , HEC and NDP Lahore.
27) Prepared report on Visit of M/s Engro Chemicals Ltd, Liberty Power Plant at Dahrki and Director Ghotki Feeder Canal Area Water Board, submitted to Director GFCAWB for his comments.
28) Proposal for joint Monitoring of Industrial and Urban Effluent into Irrigation Channels of Ghotki Feeder Canal Area Water Board.
29) Prepared Monthly Progress Reports.
30) Prepared Monthly Activity Reports of Research and Development Section-SIDA.
31) Participated in the Training Workshop on “Geographic Information System and Remote sensing,” organized by M/s WaterWatch Netherlands and SIDA.
32) Worked with team from Belgium M/s C2MS and M/s BAI for installation of Telemetry system at Head Jamrao Nara Canal System.
33) Prepared detailed report on Telemetry System installed at Twin Jamrao Head Regulator, Nara Canal ;
34) Prepared Report on environmental issues related with Water Sector and Water Management in the Ghotki Feeder Canal Area Water Board;
35) Prepared report on Effluent of M/s Clarient Company, Jamshoro.
36) Prepared detailed report on effluent of Manchar Lake which was disposed off into River Indus;
37) Report on Rapid Appraisal of Left Bank Canal Area Water Board; Food and Agriculture Organization (FAO) February 16 to 25, 2005 ;
38) Organized 3 rd meeting of ECMC held on 31 st July 2004 and prepared the minutes of meeting and after approval sent to all concerned authorities.
39) Worked with National and International Panel of Experts on “Drainage Master Plan”.
40) Arranged and attended all meetings and workshops with National and International Panel of Experts on Drainage Master Plan in Badin, Hyderabad Karachi.
41) Prepared detailed report on visit of the Sindh Province by the World Bank Team on “Drainage Master Plan,” 22 to 30 th September;
42) Worked with World Bank Mission for preparation of studies in Coastal Area of Badin and Thatta Districts, (December 2 to 10 th , 2004)