Assignments completed [continue]

43) Worked with M/s Constance Bernard, Sector Director Agriculture and Rural Development, South Asia Region, World Bank. (February 7 to 12 th , 2005 in connection of studies for Coastal Areas of Sindh Province)

44) Worked with FAO Team on preparation of Appraisal Document of Water Sector Improvement Project (WSIP).

45) Prepared report on enquiry into incident of Irrigation Colony, Mirpur Mathelo, (Ghotki Feeder Canal Area Water Board, Ghotki), as desired by MD SIDA.

46) Prepared a brief on Research and Development and its future requirements.

47) Prepared MOU and TOR between SIDA and SMO (WAPDA), ISRIP & NIO for the Monitoring of LBOD system.

48) Prepared the contract agreements on the World Bank Format for Monitoring of LBOD System.

49) Prepared revised PC-II of “Diagnostic Study of Kotri Drainage Circle.”

50) Prepared replies of observations of PDWP on the PC-II of “Diagnostic Study of Kotri Drainage Circle,” and attended the PDWP meeting.

51) Prepared the revised PC-I of “Biological Control of Waterlogging & Salinity.”

52) Prepared replies of observations of PDWP on the PC-I of “Biological Control of Water Logging” and attended the PDWP meeting.

53) Prepared detailed presentation for Managing Director-SIDA, on the Environmental Issues of four off taking canals from Kotri Barrage.

54) Prepared detailed site visit of Phuleli Canal and Akram Wah regarding disposal of untreated municipal and industrial wastewater.

55) Prepared 8 proposals on different environmental issues for committee on Environment established by the Planning Commission Government of Pakistan (August-2004). (On the basis of the above submission Federal Government is now taking studies between Guddu Barrage and Kotri Barrage through Federal Flood Commission, Ministry of Water and Power Government of Pakistan.)

56) Prepared Concept Paper on “MIS of Irrigation and Drainage Network of Sindh.

57) Prepared Concept Paper on “Water Vision – 2025.

58) Prepared detailed Concept Paper and presentation on “Performance of Indicators in Irrigation and Drainage System”.

59) Prepared proposals on environmental issues for committee on Environment established by the Planning Commission Government of Pakistan (August-2004).

60) Three Stakeholders consultative workshops were organized in November 2004 in order to update the Environmental Management and Monitoring Plan (EMMP) of LBOD and accordingly proceedings were published and distributed to all the concerned.

61) On the basis of workshops, EMMP was updated and additional studies proposed by the stakeholders and experts were formulated and submitted to the Federal EMU for implementation.

62) EMU-SIDA staff visited the Manchar lake and prepared the reports related with the Environmental issues and their remedies.

63) EMU-SIDA staff visited the Hamal Lake and prepared the reports related with the loss of several Human lives due to Environmental problems.

64) Visited Fertilizers Factories M/s Engro Chemicals Pakistan Ltd, Fuji Fertilizers Company and Liberty Power Plants. Prepared reports regarding release of effluent into the irrigation canals in the Ghotki Area Water Board.

66) Presenting Monthly Progress reports to the concerned offices regularly which have been appreciated by the donor agencies and at the Federal level.

Pages
1
  Research & Development
  EMU SIDA
  LBOD Monitoring
 

  Scope Of Work
  Studies Of (EMP)
  Technical Papers
  Assignments Completed

 

 

 
  Photo Gallery
  Publications & Reports

 

 
(c)copyrights 2007, Sindh Irrigation and Drainage Authority,Government of Sindh
Site Coordinator: Nauman Rashid Memon, IT Specialist (SIDA), Tel:022-2610122. POWERED BY GENSOFT